Post-Completion Monitoring Service for the National Road Infrastructure Performance Test Center

Location LocationYeoncheon-eup area, Yeoncheon-gun, Gyeonggi-do
Use UseResearch Complex (12 buildings)
Site Area Site Area100,215.64 ㎡
Building Area Building Area4,735.23 ㎡
Gross Area Gross Area7,342.05 ㎡
Coverage · FAR Coverage · FARCoverage 4.73% / FAR 5.88%
Applied Technology
Applied Technology

01
Real-time Construction Status Monitoring
A status service is built to monitor construction progress in real time.

02
Drone Orthophoto Time-Series Analysis
Monitoring and time-series analysis are performed through drone orthophotography.

03
Real-time Site Monitoring (Fixed CCTV)
The site is monitored in real time with fixed CCTV.

04
Thermal Imaging Hazardous Environment Analysis
Hazardous environmental information at the site is analyzed through thermal imaging.

05
AI Fire Detection
Site fires are detected in real time based on AI.

06
3D Digital Drawing Data Accumulation
On-site building data is accumulated based on 3D digital drawings.

07
AI Safety Management
On-site safety management is performed based on AI.

08
Work Process Comparison Analysis
Actual work processes are compared and analyzed against the plan.